Pacific Renewable Energy Investment Facility: Nuku''alofa
Environmental and social monitoring reports provide the status of environmental or social issues or mitigation measures related to project implementation.This document dated September 2023 is provided for the ADB project 49450-036 in Tonga.
Signing Ceremony for Tonga''s Second Large Scaled Battery Energy Storage
NUKU''ALOFA, TONGA (14th November 2019)— Tonga''s second Large scaled Battery Energy Storage System (BESS) will be built at Matatoa after an agreement was signed today between Tonga Power Limited and Akuo Energy SAS, an energy company specializing in developing and operating renewable energy power plants. Akuo Energy
Tonga Water Supply System Description Nuku''alofa/ Lomaiviti
Map: 2 Locality plan of Nuku''alofa Urban supply. (Davendra Nath-SOPAC) 2.1.1 Catchment and Intake The intake for the Nuku''alofa supply is from the bore well field of under ground freshwater lens. There is a network of 36 hand-dug or tube driven well within 140 acres of flat land. The underground is of limestone with little soil cover.
Tonga : Integrated Urban Resilience Sector Project
The project is aligned with the following impacts: (i) living standards in Nuku''alofa improved, and (ii) resilience to existing extreme natural events and to the threat of climate change increased. The project will have the following outcome: Nuku''alofa residents have access to improved, effective and climate resilient urban services and
Grant Agreement (Special Operations) for Grant 0868-TON: Nuku''alofa
Environmental and Social Monitoring Reports Pacific Renewable Energy Investment Facility: Nuku''alofa Network Upgrade Project: Environmental and Social Monitoring Report (January-June 2023) Procurement Plans Nuku''alofa Network Upgrade Project: Procurement Plan. Gender Action Plans Nuku''alofa Network Upgrade Project: Gender
Signing Ceremony for Tonga''s Second Large Scaled Battery Energy
NUKU''ALOFA, TONGA (14th November 2019)— Tonga''s second Large scaled Battery Energy Storage System (BESS) will be built at Matatoa after an agreement was signed
Pacific Renewable Energy Investment Facility: Nuku''alofa
The project will target the Area 5 of the Tonga Power Limited (TPL)''s overall plan of converting all 5 areas of Nuku''alofa network. Project Rationale and Linkage to Country/Regional Strategy The Kingdom of Tonga is a small island developing state which is susceptible to natural disasters and climate change impacts due to its geographical
49450-012: Renewable Energy Project | Asian Development Bank
Tonga Renewable Energy Project (TREP) has three components: (i) a large BESS capacity on Tongatapu to ensure that the intermittent electricity generated from solar photovoltaic and wind power to be funded by private independent power producers can be stored and used overnight without negatively affecting Tonga Power Limited''s grids;
Major port modernization underway in Tonga''s Nuku''alofa Port
Initiated in late 2020 upon approval of a $45 million grant from the ADB, the project will transform Nuku''alofa Port into a world-class international port. The Kingdom of Tonga is an archipelago of 177 islands spread across 700,000 square kilometers of the South Pacific Ocean. The majority of the population of 108,000 live on the main island
Environmental and Social Monitoring Report Tonga:
The NUDSP is a multi-sector urban development project that is expected to contribute to Tonga''s sustainable economic development by improving the standard of living in Nuku''alofa. The outcome of the project will be effective, efficient, and sustainable urban services. The project was completed in June 2020.
Nuku''alofa Network Upgrade Project: Project Administration
Project or Program Administration Manuals (PAM) provide essential administrative and management requirements for project or program implementation. This document dated December 2022 is provided for the ADB project 49450-036 in Tonga.
Tonga
Discover the Tonga renewable energy project based on storage technology, located in Nuku''alofa, Tonga, in the South Pacific Ocean.
Nuku alofa Port Upgrade Project: Report and
to the Kingdom of Tonga for the Nuku''alofa Port Upgrade Project. 2. The project will upgrade cargo wharves located in the Queen Salote International Wharf (QSIW) of Nuku''alofa Port. It will rehabilitate, renew, and expand the infrastructure; strengthen management and operations; and improve the port''s capacity.
53045-003: Nuku''alofa Port Upgrade Project
rubbish and waste (with overspill onto the foreshore), non-bunded fuel storage areas and the pooling of water and other liquids. SPC also undertook an energy audit aimed at assisting the Ports Authority Tonga (PAT) to reduce energy consumption. A range of projects and management practices were identified,
Tonga : Nuku''alofa Port Upgrade Project (Additional Financing)
The Asian Development Bank (ADB) approved on 3 December 2020 a grant not exceeding $45,000,000 to the Kingdom of Tonga from ADB Special Funds resources (Asian Development Fund) for the Nukualofa Port Upgrade Project (the ongoing project). The project became effective on January 2021 and the grant closing date is December 2026.
Pacific Renewable Energy Investment Facility Kingdom of
Tonga Nuku''alofa Network Upgrade Project (TNNUP) in five central business district areas of Nuku''alofa. 4 The rehabilitation works under the TNNUP were completed for area 1
Pacific Renewable Energy Investment Facility Kingdom of
of energy infrastructure across Tongatapu, including the proposed project area in Nuku''alofa. During disasters, failure in power distribution through damaged power lines may cause electricity supply disruption, and repair and/or replacement of damaged utility poles may result in a significantly higher monetary cost. 4.
Pacific Renewable Energy Investment Facility: Nuku''alofa
Description of Outcome Technical power losses and climate vulnerability of the electricity network in Nuku''alofa reduced. Progress Toward Outcome Implementation Progress Description of Project Outputs Nuku''alofa electricity network system improved Project implementation capacity and gender inclusiveness of TPL operations enhanced.
Pacific Renewable Energy Investment Facility Kingdom of
11. The project is aligned with the following impact: Tonga''s dependency on imported fossil fuel for power generation reduced. The project will have the following outcome: access to clean, resilient, and affordable energy for the population in Tonga at a lower cost expanded. C. Outputs 12. Output 1: Battery energy storage system on Tongatapu.
Nuku''alofa Network Upgrade Project: Investment Facility Report
The project will help the Government of Tonga reduce climate vulnerability and technical power losses in the electricity network by upgrading the aged and inefficient network to a
Kingdom of Tonga Celebrates Major Milestone Towards
The system includes a 350kW solar plant and a 1003kW/1856kWh battery energy storage system, which will enable TPL to integrate renewable energy into its
Nuku''alofa Network Upgrade Project: Summary Poverty
The project will help improve opportunities for businesses, jobs, and social development in the Nuku''alofa urban area on the main island of Tongatapu. The project will be carried out using similar implementation arrangements as were established in TPL for an ongoing ADB project—the Outer Island Renewable Energy Project.e
42394-022: Nuku''alofa Urban Development Sector Project
of Foreign Affairs and Trade (DFAT), jointly fund the Nuku''alofa Urban Development Sector Project (NUDSP). The NUDSP is a multi-sector urban development project that is expected to contribute to Tonga''s sustainable economic development by improving the standard of living in Nuku''alofa. The outcome of the project will be effective
53045-003: Nuku''alofa Port Upgrade Project
The project will upgrade the Nukualofa port, rehabilitate, renew and expand the existing infrastructure and improve the management and operations practices. The project outputs will result in the following outcome: capacity and operations of the Nukualofa Port improved. The project will be aligned with the following impact: safer, more reliable, and more
Nuku''alofa Network Upgrade Project: Economic Analysis
Nuku''alofa Network Upgrade Project (IFR TON 49450-036) ECONOMIC ANALYSIS A. Introduction 1. The implementing agency, Tonga Power Limited (TPL), generates and distributes Guidance for Clean Energy Projects. Manila. 11 Based on diesel generation fuel efficiency of 4.07 kWh per liter for Tongatapu and renewables penetration of 12.7%,
53045-002: Fanga''uta Lagoon Bridge Project
The proposed project will build a bridge across the Fanga''uta Lagoon in Nuku''alofa, the capital of the Kingdom of Tonga (Tonga). The crossing will consist of an approximately 720 m long bridge and 4.96 km of approach roads from
Nuku''alofa Port Upgrade Project (Additional Financing): Report
The project is located within the Queen Salote International Wharf of the Nuku''alofa Port and will improve the port''s capacity and operations. It will rehabilitate port infrastructure, extend international cargo wharves and supporting infrastructure, and improve port operations and management.
Kingdom of Tonga Celebrates Major Milestone
The system includes a 300kW solar plant and a 2 Mega-watt hour battery energy storage system, which will enable TPL to integrate renewable energy into its electricity grid and provide reliable power to
Nuku''alofa Port Upgrade Project: Strategic Procurement
The proposed project aims to upgrade and develop the Queen Salote International Wharf (QSIW) in Nuku''alofa Port as an international gateway container and general cargo terminal and allow it to accommodate future trade growth and expansion, thereby strengthening Tonga''s economic and social connectivity in the Pacific.
Our Network Upgrade Plans | Tonga Power Limited
This project has been divided into 5 areas of the Central Business District of Nuku''alofa and aims to completed by year 2023. For the outer islands of ''Eua, Vava''u and Ha''apai, OIREP also known as the" Outer islands Energy Efficiency project", looks after the upgrade of the power network infrastructure.
Nuku''alofa Network Upgrade Project: Contribution to
Nuku''alofa Network Upgrade Project (IFR TON 49450-036) CONTRIBUTION TO STRATEGY 2030 OPERATIONAL PRIORITIES OP No. Corporate Results Framework tonga, nuku''alofa, network upgrade project, pacific renewable energy, electricity network infrastructure, disaster resilience, climate resilient infrastructure, 49450-036, grant 0868,
Nuku''alofa Urban Development Sector Project
Reports and recommendations of the president (RRP) describes the terms and conditions of a project for consideration for approval by ADB. This document dated September 2011 is provided for the ADB project 42394-022 in Tonga.
Support for stable and sustainable energy sector | Tonga Power
10 April 2024. Support for stable and sustainable energy sector. The Government of Tonga and the Government of Australia today signed a new partnership agreement for AUD15 million in additional financing to Tonga''s energy sector. The partnership will fund Tonga Power Limited to upgrade the 13-kilometre main transmission lines in Tongatapu
NNUP GROUND BREAKING | Tonga Power Limited
The Nuku''alofa Network aims to upgrade and modernize the electricity network in the Nuku''alofa Area in 5 phases which encompasses the 5 areas of Nuku''alofa. NNUP will
onga: Nuku''alofa Network under the Pacific Renewable
The proposed project will support the network upgrade and rehabilitation of the Nukualofa Network Upgrade Project (NNUP) Area 5. This project will upgrade both MV and LV
53045-003: Nuku''alofa Port Upgrade Project
The city accommodates 24,500 people out of Tongatapu''s total population of 108,020 according to the latest estimate by the National Statistics Office (2018). Around 71% of the population of Tonga reside on Tongatapu. 117. QSIW is located in Nuku''alofa and is part of the larger Nuku''alofa Port complex.
Nuku''alofa Network Upgrade Project: Procurement Plan
Download (Free: 1.36 MB) Procurement plans describe and update the procurement of major goods, works and consulting services either ongoing or expected to take place related to a project or program. This document dated 21 September 2022 is provided for the ADB project 49450-036 in Tonga.
53045-003: Nuku''alofa Port Upgrade Project
Project No.: 53045-003-TON Status: Final. October 2020. Tonga: Nuku''alofa Port Upgrade Project. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of the ADB''s Board of Directors, Management, or staff, and may be preliminary in nature.
Tonga: Nuku''Alofa Port Upgrade Project
For the three projects where MOI was the implementing agency, a project accountant was recruited and based in the project management unit (PMU), to handle the disbursements and financial management tasks for each project. B. PROJECT DESCRIPTION 4. The Nuku''alofa port is the main international port of Tonga and the country''s lifeline, given
49450-036: Pacific Renewable Energy Investment Facility:
The project will convert the distribution network of the Nuku''alofa with climate resilient infrastructure. The project will (i) convert the open overhead network to
Tonga: Pacific Renewable Energy Investment Facility: Nuku''alofa
The project will convert the distribution network of the Nuku''alofa with climate resilient infrastructure. The project will (i) convert the open overhead network to covered area bundled conductors, (ii) replace overhead consumer connections to underground cables, (iii) convert existing old distribution poles to climate resilient high